mars 28, 2019

STEEL: PICTURES OF THE WORKSITE

Started in Septembre 2017, Steel  worksite reflects the extent of this project: a 16 hectares land and a 16 meters drop. Half of the main structure has been completed and 80% of the grading and water networks. The installation of the metal fishnet, Steel‘s emblem, is 70% finalised: this structure has to be installed before the roof that it will cover which is a huge technical challenge. At the height of the project 1,000 people will work on the construction site and almost 200 people are already working on it.